Tower control can be compared to driving a model railway and places high demands on safety. The radio control occurs from a shunting tower with certain limitations on speed. From here, all the shunting of the trains is controlled from a computerized signal box. In the tower there is a fixed radio and manoeuvring equipment. All the parts can be easily replaced during service.
